Avery Construction was awarded the contract by City of Sault Ste Marie to fully reconstruct the 600m long Wemyss Street in Sault Ste Marie. As General Contractor, our scope of work included full removals, installation of new infrastructure (water main, sewer and storm), reconstruction of the road base along with curb, sidewalk and paving