Avery Construction was awarded the contract by PUC Services to upgrade the existing watermain in the Industrial Park. Our scope of work included surface removals, installation of new watermain infrastructure along with commissioning and connections. This involved a road closure and re-paving of the roadway in the area of the excavation.