Avery Construction was awarded the contract by City of Sault Ste Marie for the re-surfacing of Wallace Terrace between Goulais Avenue and Allen’s Side Road in Sault Ste Marie. Our scope of work included traffic control, milling of the existing asphalt, replacement of curb and sidewalk, and re-paving of the roadway.