Avery Construction was awarded the contract by City of Sault Ste Marie to fully reconstruct the 300m long Stanley Street in Sault Ste Marie. As General Contractor, our scope of work includes full removals, installation of new infrastructure (water main, sewer and storm), reconstruction of the road base along with curb, sidewalk and paving.