Avery Construction was subcontracted by Jobst Brothers Construction to expand the parking lot at Korah Collegiate in Sault Ste Marie. We were responsible for excavation, supply and placement of new granulars and storm sewer upgrades, curb, sidewalk and asphalt.
2023 Civic Centre - Sault Ste Marie
Avery Construction was subcontracted by Ontario Concrete Finishing to perform the demo, removals, foundation excavation and backfill, supply and placement of pavers as well as some curb for the Civic Centre Exterior Improvements project. Our team understands the importance of a quality finished product and completed this work with ease and professionalism.
2023 Hollingsworth Dam Slope Stabilization
Avery Construction was awarded the contract to supply and place rip rap protection along the embankment at Hollingsworth Dam located between Wawa, ON and Hawk Junction, ON. Our scope of work included manufacturing the rip rap, prepping the shoreline for the rock, hauling to site, and placing the rock as a slope stabilization measure. In addition, we were tasked with hauling 2000m3 of rip rap to another site and stockpiling for future use
2022 Downtown Plaza
Avery Construction was awarded the contract for the Downtown Plaza Project in Sault Ste Marie. As the general contractor, we are responsible for the planning and execution of all components of the project including the management of our subcontractors and self performing of our work. This project involved a small building for office, mechanical room, change room and zamboni room. On the exterior, there is an outdoor rink, stage, water feature, amphitheater, mobile kitchen units, plenty of concrete pavement and asphalt as well.
2022 Cedar and Dufferin Street Reconstruction
Avery Construction was awarded the contract for the reconstruction of Cedar Street and Dufferin Street in Sault Ste Marie. Our scope involved all sewer and water replacement and road reconstruction including concrete curb, sidewalk and asphalt pavement.
2022 Miscellaneous Pavement
Avery Construction was awarded the contract for the miscellaneous paving contract in Sault Ste Marie. This involved the reconstruction and paving of a small parking lot and several milling and resurfacing sections.
2022 West End Sewage Treatment Plant
Avery Construction was awarded the contract for the placement of curb and asphalt at the West End Sewage Treatment Plant in Sault Ste Marie.
2022 Wright Street Watermain Replacement
Avery Construction was awarded the contract for the replacement of approx. 150m of watermain in the West End of Sault Ste Marie.
2022 Aubrey Falls Dam and Trolling Lake Dam Rehabilitation
Avery Construction was awarded the contract for the rehabilitation of the trolling lake and Aubrey lake dam located north east of Sault Ste Marie.
2022 SAH Residential Withdrawal Management Facility
Avery Construction was awarded the contract for the concrete demo and backfill, site services, site excavation and parking lot reconstruction for the new SAH Residential Withdrawal Management Facility in Sault Ste Marie.