Avery Construction was awarded the contract to supply and place rip rap protection along the embankment at Hollingsworth Dam located between Wawa, ON and Hawk Junction, ON. Our scope of work included manufacturing the rip rap, prepping the shoreline for the rock, hauling to site, and placing the rock as a slope stabilization measure. In addition, we were tasked with hauling 2000m3 of rip rap to another site and stockpiling for future use