Avery Construction was awarded the contract for the demolition and excavation portion of the Tenaris ERW project in Sault Ste Marie. This project saw us completing all sawcutting, demolition and removal of concrete foundations and floor, excavation and backfill for foundations, tunnel demolition and installation of a rail spur.
2021 Third Line East Reconstruction
Avery Construction was awarded the contract for the complete reconstruction of Third Line East from Black Road to the Hospital entrance in Sault Ste Marie. Our scope included installation of new sewer, reconstruction of roadway including curb, asphalt and sidewalk and deep culvert crossings.
2021 Miscellaneous Aqueduct Replacements
Avery Construction was awarded the contract for the complete removal and replacement of two sections of Aqueduct in Sault Ste Marie. This involved dewatering, concrete demolition and removal as well as full reconstruction of each section.
2021 Algoma Power Building
Avery Construction was awarded the contract for the civil component of the Algoma Power Build in Sault Ste Marie. This included the excavation and backfill, site services, parking lot construction including asphalt, curb and sidewalk.
2021 NCC Twin Pad
Avery Construction was awarded the contract for the civil component of the NCC Twin Pad in Sault Ste Marie. This included the excavation and backfill, site services, parking lot construction including asphalt, curb and sidewalk.
2020 Farwell Terrace Aquaduct
Avery Construction was awarded the contract for the complete removal and replacement of two sections of Aqueduct in Sault Ste Marie. This involved dewatering, concrete demolition and removal as well as full reconstruction of each section.
2020 Sixth Avenue Road Reconstruction
Avery Construction was awarded the contract for the full reconstruction of Sixth Avenue including all water and sewer.
2020 Northern Avenue Resurfacing
Avery Construction was awarded the contract for the resurfacing of Northern Avenue in Sault Ste Marie.
2019 McNabb Street Storm Sewer Repair
In late 2019, Avery Construction was awarded the contract to perform an emergency repair on storm main within the limits of Sault Ste. Marie. This involved the replacement of larger diameter CSP with 1500mm concrete pipe and the installation of a new manhole.
2019 Agawa Canyon Tour Train Station – Mill Square
Avery Construction will be completing the install of site services, foundation excavation and backfill as well as parking lot and roadway construction for the proposed Agawa Canyon Tour Train Station being built at the former St Mary’s Paper Site which is now the Mill Square in Sault Ste. Marie.