2021 Tenaris ERW Project

Avery Construction was awarded the contract for the demolition and excavation portion of the Tenaris ERW project in Sault Ste Marie. This project saw us completing all sawcutting, demolition and removal of concrete foundations and floor, excavation and backfill for foundations, tunnel demolition and installation of a rail spur.

2021 Third Line East Reconstruction

Avery Construction was awarded the contract for the complete reconstruction of Third Line East from Black Road to the Hospital entrance in Sault Ste Marie. Our scope included installation of new sewer, reconstruction of roadway including curb, asphalt and sidewalk and deep culvert crossings.

2021 NCC Twin Pad

Avery Construction was awarded the contract for the civil component of the NCC Twin Pad in Sault Ste Marie. This included the excavation and backfill, site services, parking lot construction including asphalt, curb and sidewalk.

2019 McNabb Street Storm Sewer Repair

In late 2019, Avery Construction was awarded the contract to perform an emergency repair on storm main within the limits of Sault Ste. Marie. This involved the replacement of larger diameter CSP with 1500mm concrete pipe and the installation of a new manhole.