2019 Ruth Street Road Reconstruction

Avery Construction was awarded the contract for the reconstruction of Ruth Street in Sault Ste Marie,ON. As the General Contractor, our work includes the install of new water and sewer infrastructure and reconstruction and resurfacing of the street.

2019 Demolition – Queen Street Fire losses

Avery Construction was contacted by Winmar Property Restoration to demolish 3 buildings that were destroyed due to a tragic fire which resulted in all three buildings being a total loss. We were on site within a couple of hours and our excavator worked with the Ontario Fire Marshal to sort through debris in an effort to determine a cause. We demolished the three downtown buildings, removed foundations and backfilled to grade.

2019 Fort Creek Aqueduct Laneway Project

Avery Construction is pleased to have been awarded the contract for the reconstruction of the Fort Creek Aqueduct which runs through the laneway behind John Street. This is scheduled to be a 2 year project. Please stay tuned to our social media accounts for updates.

2019 12 Unit Residential Building – Richard’s Landing, ON

Avery Construction was hired by Praztek Construction out of Timmins,ON to complete the site work for the new 12 unit housing complex that is being built in Richard’s Landing,ON. Our work consists of Clearing and Grubbing of the area, foundation excavation and backfill, site services and parking area construction. Within our scope is also the construction of a retaining wall.


2018 Multi Unit Residential Building Development Project

We were awarded the contract for the first phase of the Multi Unit Residential Building Development project in Sault Ste. Marie. This phase of the project consists of site grading, installation of sanitary sewer, watermain and storm-water management.

2018 McNabb Street Drainage Improvements

Avery Construction was awarded the contract for the Mcnabb Street Drainage Improvements in Sault Ste. Marie. As the General Contractor, our work consists of the installation of large diameter pipe, some water main re-routing and the restoration of the work area once complete.

2018 Fort Creek Aqueduct Reconstruction – John St to Carmens Way

Avery Construction was awarded the contract for the reconstruction of the Fort Creek aqueduct along Wellington St West in Sault Ste Marie. This work consists of the demolition of the existing concrete aqueduct and the installation of the new precast sections, miscellaneous water main re-configurations and road resurfacing.

2018 Dunphy Bridge Repair Project

Avery Construction was awarded the contract to make repairs to the Dunphy Bridge near Dubreuilville, Ontario. As the General Contractor, our scope includes the repair of the foundation, placement of riprap and filling of the existing crib. This work was completed for Brookfield Renewable.