2019 McNabb Street Storm Sewer Repair

In late 2019, Avery Construction was awarded the contract to perform an emergency repair on storm main within the limits of Sault Ste. Marie. This involved the replacement of larger diameter CSP with 1500mm concrete pipe and the installation of a new manhole.