2014 Town Line and Base Line Bridges

In the spring of 2014, Avery Construction was awarded the contract to replace four bridges on Town Line and Base Line Road in Sault Ste. Marie as part of a two year plan. Construction Began in Mid-June 2014 and consisted of the closure of the road at two bridge locations and removal of two bridges and   installation of new replacement bridges as well as reconstruction of each bridge approach. Replacement of the remaining two bridges as part of this contract are to be completed by the end of 2015.