2014 Second Line Widening – Phase Two

In the Spring of 2014, Avery Construction was awarded the contract for the installation of sanitary and storm pipe as well as the reconstruction and widening of the approximately 700 meter stretch of road. Our work consisted of approximately 700 meters of sanitary pipe and approximately 430 meters of concrete storm pipe, manholes and catch basins, road and sidewalk construction and the installation of a retaining wall.

  • Storm and Sanitary Sewer Install

  • Road widening and re-construction

  • Sidewalk Install

  • Traffic Control

  • Retaining Wall Construction

  • Hub Trail Construction

  • Install Culvert and Headwalls

A thank you note from Avery Construction