Avery Construction was awarded the contract to upgrade the existing water main at the Sault Ste. Marie Airport in the Spring of 2012. This involved installing and commissioning approximately 500M of 150MM PVC pipe and all appurtenances. Part of the contract required us to use directional boring methods to cross underneath the main entrance to the airport so as not to disrupt the flow of traffic to the Airport itself.