This was a two year project consisting of rock removal, earth excavation, and the placement of granulars for additional travel lanes. In 2007, an additional travel lane for turning was constructed at a busy intersection. Work in 2008 consisted of the installation of a large box culvert underneath the highway, as well as the construction of an additional lane.
2007 Desbarats – Highway 17
This was a two year project consisting of rock removal, earth excavation, and the placement of granulars for additional travel lanes. In 2007, an additional travel lane for turning was constructed at a busy intersection. Work in 2008 consisted of the installation of a large box culvert underneath the highway, as well as the construction of an additional lane.