2017 Bay Street Seawall Reconstruction

In June 2017 Avery Construction was awarded the contract to reconstruct an existing seawall along the waterfront on Bay Street in Sault Ste. Marie, Ontario. Our work consisted of the removal of an existing sheet pile wall, the supply and placement of rip rap material and associated landscaping.

2017 ARCH Hospice Expansion

Avery Construction performed the civil portion of the expansion to ARCH hospice in Sault Ste. Marie during the summer of 2017. Our work consisted of foundation excavation and backfill, sanitary sewer service, drainage upgrades and site grading. This work was completed for Jobst Construction.

2017 Northside Toyota Detail Shop Addition

Avery Construction was awarded the contract for the civil component of an addition to the existing Northside Toyota Building in Sault Ste. Marie, ON. Our work consists of the removal of existing asphalt, excavation and backfill of foundations, prep for floor slab, installation of oil separator units and realignment of existing water main. This work began in December 2017 and will continue through the winter.

2017 Prince Lake Road Upgrades

In Summer 2017 Avery Construction was awarded the contract to complete some upgrades to the Prince Lake Road in Prince Township. Our work generally consisted of some minor blasting, re-grading of the existing road to allow a more desirable grade, rip rap protection and guard rail installation.

2017 Grace Street Re-Construction

In the spring of 2017, Avery Construction was awarded the re-construction of Grace Street in Sault Ste. Marie,ON. Our work began in July 2017 and was completed on schedule. Our scope consisted of the removal of existing roadway and services, the installation of the new Storm, Sanitary and Watermain, re-construction of the roadway and restoration.

2016 Fort Creek Aqueduct Construction – Albert St to Cathcart St

In the Spring of 2016, Avery Construction was selected by Jobst Construction to do the civil portion of the Fort Creek Aqueduct between Albert Street and Cathcart Street. Our work included the excavation and backfill for the aqueduct structure, the removal and installation of water main, sanitary and storm sewers as well as the reconstruction of the roadway and all restoration.

2016 Second Avenue Re-Construction

In the Spring of 2016, Avery Construction was awarded the contract for the reconstruction of Second Avenue in Sault Ste. Marie, ON between Wallace Terrace and Connaught Avenue. The scope included the removal and installation of watermain and services, sanitary sewer main and services and storm sewer main and service as well as the re-construction of the roadway including curb, sidewalk, asphalt and all restoration.