2011 SSM PUC Building

Avery Construction was awarded the civil portion of the new PUC building located on Second Line East in Sault Ste Marie. This involved Sewer and Water distribution install, Building excavation and backfill, parking lot construction, etc. We began this work in the Fall of 2011. The PUC has since taken over occupancy of the building.