Avery Construction was awarded the contract for the Downtown Plaza Project in Sault Ste Marie. As the general contractor, we are responsible for the planning and execution of all components of the project including the management of our subcontractors and self performing of our work. This project involved a small building for office, mechanical room, change room and zamboni room. On the exterior, there is an outdoor rink, stage, water feature, amphitheater, mobile kitchen units, plenty of concrete pavement and asphalt as well.
2022 Cedar and Dufferin Street Reconstruction
Avery Construction was awarded the contract for the reconstruction of Cedar Street and Dufferin Street in Sault Ste Marie. Our scope involved all sewer and water replacement and road reconstruction including concrete curb, sidewalk and asphalt pavement.
2022 Miscellaneous Pavement
Avery Construction was awarded the contract for the miscellaneous paving contract in Sault Ste Marie. This involved the reconstruction and paving of a small parking lot and several milling and resurfacing sections.
2022 West End Sewage Treatment Plant
Avery Construction was awarded the contract for the placement of curb and asphalt at the West End Sewage Treatment Plant in Sault Ste Marie.
2022 Wright Street Watermain Replacement
Avery Construction was awarded the contract for the replacement of approx. 150m of watermain in the West End of Sault Ste Marie.
2022 Aubrey Falls Dam and Trolling Lake Dam Rehabilitation
Avery Construction was awarded the contract for the rehabilitation of the trolling lake and Aubrey lake dam located north east of Sault Ste Marie.
2022 SAH Residential Withdrawal Management Facility
Avery Construction was awarded the contract for the concrete demo and backfill, site services, site excavation and parking lot reconstruction for the new SAH Residential Withdrawal Management Facility in Sault Ste Marie.
2021 Tenaris ERW Project
Avery Construction was awarded the contract for the demolition and excavation portion of the Tenaris ERW project in Sault Ste Marie. This project saw us completing all sawcutting, demolition and removal of concrete foundations and floor, excavation and backfill for foundations, tunnel demolition and installation of a rail spur.
2021 Third Line East Reconstruction
Avery Construction was awarded the contract for the complete reconstruction of Third Line East from Black Road to the Hospital entrance in Sault Ste Marie. Our scope included installation of new sewer, reconstruction of roadway including curb, asphalt and sidewalk and deep culvert crossings.
2021 Miscellaneous Aqueduct Replacements
Avery Construction was awarded the contract for the complete removal and replacement of two sections of Aqueduct in Sault Ste Marie. This involved dewatering, concrete demolition and removal as well as full reconstruction of each section.